Avatar

Prabhu kiran Veeramaneni

Experienced Electrical & Instrumentation Engineer in Oil & Gas Industry

Hello and welcome to my personal website! My name is Prabhu Kiran Veeramaneni, and I am a dedicated Electrical Instrumentation & Control Engineer with a passion for the Oil and Gas, Marine, and Fire and Gas industries. With over 6 years of experience in project management, engineering design, procurement, and automation engineering, I am committed to leveraging my technical skills and expertise to drive success in every project I undertake. I hold a Bachelor's degree in Electronics and Instrumentation Engineering and have worked with reputable companies such as Marsol Technologies FZE, Al Asab General Transport and Contracting Establishment, and Prolific Systems and Technologies Pvt. Ltd. My experience includes designing electrical systems, managing project documentation, overseeing installation and commissioning activities, and much more. I am fluent in multiple languages including Telugu, English, Hindi, and Tamil, and hold both UAE and Indian driving licenses. Additionally, I have a valid 10-year business visa for the USA. Thank you for visiting my website, and I look forward to connecting with you and discussing potential opportunities for collaboration. Feel free to reach out to me at any time. Best regards, Prabhu Kiran Veeramaneni

Education

B.Tech, Electronics and Instrumentation Engineering

Velagapudi Ramakrishna Siddhartha Engineering College

Diploma, Applied Electronics and Instrumentation

AANM & VVRSR Polytechnic College

SSC, N/A

Vignan Bharat Public School

Experience

E&I Project Engineer

Marsol Technologies FZE - UAE

1. Preparing, scheduling, coordinating, and monitoring assigned engineering projects. 2. Engineering Designing - Creating critical documents such as Functional Descriptions, Cause and Effect Diagrams, SAT/FAT Procedures, Loop Drawings, Single Line Diagrams (SLD), IO Lists, etc. 3. Material Procurement - Initiating inquiries, studying quotations, placing purchase orders (POs), following up, and ensuring timely delivery. 4. Management Information System - Generating and analyzing various reports throughout the project life cycle. 5. Allocating manpower, planning material and machine availability to prevent hindrances during the construction phase. 6. Properly tracking and controlling project document transmittals. 7. Scheduling, coordinating, and monitoring engineering projects as assigned. 8. Defining project parameters, assigning responsibilities to team members, and overseeing the project team. 9. Ensuring overall quality control of the work (budget, schedule, plans, personnel performance) and providing regular project status reports. 10. Organizing, shipping, and delivering goods worldwide efficiently, on time, and in a cost-effective manner, while being knowledgeable about the latest INCOTERMS and their applicability. 11. Designing control panels, programming PLCs, designing HMIs, and overseeing installation and commissioning. 12. Installing and commissioning DIFF Systems on Helidecks. Skills: Electrical Design · Technical Documentation · Procurement · Project Estimation · Cost Management · Siemens Tia Portal · HMI Design · Product Design · Project Management · PLC Programming.

E&I Engineer

Al Asab General Transport and Contracting Establishment - Abu Dhabi, UAE

1. Prepare PTW (Permit to Work) System work activities and the initial stage of site arrangement. 2. Follow the ADNOC LSR (Loss Prevention and Safety Rules) and PTW System. 3. Verify high-risk activities, work sequences, and hazard prevention measures in accordance with ADNOC HSE (Health, Safety, and Environment) policy. Participate in HAZOP (Hazard and Operability) review sessions and ensure all identified issues are addressed. 4. Lead the construction team in the assembly of various GL (Gas Lift) Wells, PWRI (Produced Water Re-Injection) Wells, WAG (Water-Alternating-Gas) Wells, Remote De-Gassing Stations (RDS), and Central De-Gassing Stations (CDS). 5. Erect solar panels and solar equipment such as CCU (Charge Control Unit), DB (Distribution Box), Battery Box, and lay solar cables, perform glanding, and terminate connections. 6. Install WHCP and tubing from WHCP to the Wellhead, as well as the installation of RTU Systems. 7. Conduct hydraulic tube flushing to detect any leaks in tubes and tube joints. 8. Install pressure transmitters and impulse tubing for gas and oil pipelines. 9. Install motor-operated control valves, hydraulic oil-operated safety valves, and shutdown valves. 10. Supervise the use of OTDR (Optical Time Domain Reflectometer) to test FOC (Fiber-Optic Cable). 11. Verify cause and effects during field pre-commissioning of fire and gas systems. 12. Follow SAT (Site Acceptance Test) procedures for WHCP, RTU, and CI-SKID.

Automation Engineer

Prolific Systems and Technologies Pvt. Ltd. - Hyderabad, India

1. Installation and commissioning of SIEMENS PLC, HMI & PCS-7 2. PLC programming, HMI & SCADA Graphics designing using WINCC Professional, Advanced, Flexible. 3. Maintenance of Siemens AC and DC drives, PAC meters, and soft starters. 4. Parameterization of SMART field instruments (TH300, TH400,LR250, CLS200, FC MASS 6000, MAG 5000, 5. MASS 2100, FUS060, Sipart PS2 positioned and IFM IO link modules AL1100. 6. Configuration and Programming of AB500 PLC, RS LOGIX.

Skills

Electrical Design

Technical Documentation Procurement Project Estimation Cost Management

Automation Engineering

Siemens Tia Portal HMI Design Product Design PLC Programming

Projects

BORWIN5

April 2022

DIFFS SKID - STANDALONE PLC BASED Complete system design, Documentation, Procurement, Programming, FAT.

ASAB OIL GAS expansion Package C

March 2019

Commissioning Engineer. Commissioned 50+ Oil wells and 5 clusters and 5 Degassing stations

Contact

Want to say hello? Interested in collaboration? Shoot me an email, and I will get back to you pronto! [email protected]