Hello and welcome to my personal website! My name is Prabhu Kiran Veeramaneni, and I am a dedicated Electrical Instrumentation & Control Engineer with a passion for the Oil and Gas, Marine, and Fire and Gas industries. With over 6 years of experience in project management, engineering design, procurement, and automation engineering, I am committed to leveraging my technical skills and expertise to drive success in every project I undertake. I hold a Bachelor's degree in Electronics and Instrumentation Engineering and have worked with reputable companies such as Marsol Technologies FZE, Al Asab General Transport and Contracting Establishment, and Prolific Systems and Technologies Pvt. Ltd. My experience includes designing electrical systems, managing project documentation, overseeing installation and commissioning activities, and much more. I am fluent in multiple languages including Telugu, English, Hindi, and Tamil, and hold both UAE and Indian driving licenses. Additionally, I have a valid 10-year business visa for the USA. Thank you for visiting my website, and I look forward to connecting with you and discussing potential opportunities for collaboration. Feel free to reach out to me at any time. Best regards, Prabhu Kiran Veeramaneni
Education
B.Tech, Electronics and Instrumentation Engineering
Velagapudi Ramakrishna Siddhartha Engineering College
Diploma, Applied Electronics and Instrumentation
AANM & VVRSR Polytechnic College
SSC, N/A
Vignan Bharat Public School
Experience
E&I Project Engineer
Marsol Technologies FZE - UAE
1. Preparing, scheduling, coordinating, and monitoring assigned engineering projects. 2. Engineering Designing - Creating critical documents such as Functional Descriptions, Cause and Effect Diagrams, SAT/FAT Procedures, Loop Drawings, Single Line Diagrams (SLD), IO Lists, etc. 3. Material Procurement - Initiating inquiries, studying quotations, placing purchase orders (POs), following up, and ensuring timely delivery. 4. Management Information System - Generating and analyzing various reports throughout the project life cycle. 5. Allocating manpower, planning material and machine availability to prevent hindrances during the construction phase. 6. Properly tracking and controlling project document transmittals. 7. Scheduling, coordinating, and monitoring engineering projects as assigned. 8. Defining project parameters, assigning responsibilities to team members, and overseeing the project team. 9. Ensuring overall quality control of the work (budget, schedule, plans, personnel performance) and providing regular project status reports. 10. Organizing, shipping, and delivering goods worldwide efficiently, on time, and in a cost-effective manner, while being knowledgeable about the latest INCOTERMS and their applicability. 11. Designing control panels, programming PLCs, designing HMIs, and overseeing installation and commissioning. 12. Installing and commissioning DIFF Systems on Helidecks. Skills: Electrical Design · Technical Documentation · Procurement · Project Estimation · Cost Management · Siemens Tia Portal · HMI Design · Product Design · Project Management · PLC Programming.
E&I Engineer
Al Asab General Transport and Contracting Establishment - Abu Dhabi, UAE
1. Prepare PTW (Permit to Work) System work activities and the initial stage of site arrangement. 2. Follow the ADNOC LSR (Loss Prevention and Safety Rules) and PTW System. 3. Verify high-risk activities, work sequences, and hazard prevention measures in accordance with ADNOC HSE (Health, Safety, and Environment) policy. Participate in HAZOP (Hazard and Operability) review sessions and ensure all identified issues are addressed. 4. Lead the construction team in the assembly of various GL (Gas Lift) Wells, PWRI (Produced Water Re-Injection) Wells, WAG (Water-Alternating-Gas) Wells, Remote De-Gassing Stations (RDS), and Central De-Gassing Stations (CDS). 5. Erect solar panels and solar equipment such as CCU (Charge Control Unit), DB (Distribution Box), Battery Box, and lay solar cables, perform glanding, and terminate connections. 6. Install WHCP and tubing from WHCP to the Wellhead, as well as the installation of RTU Systems. 7. Conduct hydraulic tube flushing to detect any leaks in tubes and tube joints. 8. Install pressure transmitters and impulse tubing for gas and oil pipelines. 9. Install motor-operated control valves, hydraulic oil-operated safety valves, and shutdown valves. 10. Supervise the use of OTDR (Optical Time Domain Reflectometer) to test FOC (Fiber-Optic Cable). 11. Verify cause and effects during field pre-commissioning of fire and gas systems. 12. Follow SAT (Site Acceptance Test) procedures for WHCP, RTU, and CI-SKID.
Automation Engineer
Prolific Systems and Technologies Pvt. Ltd. - Hyderabad, India
1. Installation and commissioning of SIEMENS PLC, HMI & PCS-7 2. PLC programming, HMI & SCADA Graphics designing using WINCC Professional, Advanced, Flexible. 3. Maintenance of Siemens AC and DC drives, PAC meters, and soft starters. 4. Parameterization of SMART field instruments (TH300, TH400,LR250, CLS200, FC MASS 6000, MAG 5000, 5. MASS 2100, FUS060, Sipart PS2 positioned and IFM IO link modules AL1100. 6. Configuration and Programming of AB500 PLC, RS LOGIX.
Skills
Electrical Design
Automation Engineering
Projects
BORWIN5
April 2022
ASAB OIL GAS expansion Package C
March 2019